Landfill degasing

Reference plants:

Minsk, Belarus, degassing station at the Trostenets SDW landfill, electric power is 3.5 MW, it is operated. Subsequent construction stages in 2017 – 2019, power improvement up to 5.8 MW.

Minsk, Belarus, degassing station at the Severniy SDW landfill, designed electric power is 5.6 MW

Petersburg, Russia, Novoselki SDW landfill, at the design and construction stage. The total designed power is 9.8 MW.

The first stage — 5.6 MW — the planned commissioning period — 2018

The second stage — 4.2 MW — the planned commissioning period — 2019